| 1 | RECOGNIZABLE COLORING OF GRAPHS | Zahra Hamed-Labbafian- Michael A. Henning- Mostafa Tavakoli- Narjes Sabeghi | Discussiones Mathematicae Graph Theory | 2025 | Article In Publication |
| 2 | Determining the irregular chromatic number of graphs using a rank-based genetic algorithm | ZAHRA HAMED-LABBAFIAN, MOSTAFA TAVAKOLI, NARJES SABEGHI, and Ottorino Ori | Fullerenes, Nanotubes and Carbon Nanostructures | 2025 | Article In Publication |
| 3 | Using the generalized maximum covering location model to control a project's progress | Narjes Sabeghi, Hamed Reza Tareghian | Computational Management Science | 2020 | Article In Publication |
| 4 | Determining the timing of project control points using a facility location model and simulation | Narjes Sabeghi, Hamed Reza Tareghian, Erik Demeulemeester, Hasan Taheri | Computers and Operations Research | 2015 | Article In Publication |
| 5 | Resolving Edge Colorings: Exact Results and a Tabu Search Heuristic | Narjes Sabeghi-Zohre Shoja-Ahmad Erfanian-MostafaTavakoli | INTERNATIONAL JOURNAL OF MATHEMATICS AND MATHEMATICAL SCIENCES | 24 August 2026 | Article In Publication |
| 6 | Design and implementation of a graph-coloring algorithm for optimizing flight-level allocation in air traffic management in Iran | Seyed Ali Asghar Mosavi- Ahmad Erfanian- Narjes Sabeghii | Iranian Journal of Numerical Analysis and Optimization (IJNAO) | June 2026 | Article In Publication |
| 7 | Mutual visibility in graphs: hierarchical products, genetic algorithm and some applications | Zahra Hamed-Labbafian- Mostafa Tavakoli- Narjes Sabeghi- Aleksander Vesel | The Journal of Supercomputing | 26 May 2026 | Article In Publication |
| 8 | Determining Control Points in the Project Life Cycle: A Heuristic Approach Utilizing Tabu Search | Narjes Sabeghi | Control and Optimization in Applied Mathematics | 2025-04-23 | Article In Publication |
| 9 | Optimized determination of saturation numbers in fullerene graphs using tabu search | Sara Oskoueian- Mostafa Tavakoli- Narjes Sabeghi | Fullerenes, Nanotubes and Carbon Nanostructures | 2024-11-18 | Article In Publication |
| 10 | Genetic Algorithm for Finding the Global Forcing Number of Bipartite Graphs | Sara Oskoueian, Mostafa Tavakolian d Narjes Sabeghi | Mathematics Interdisciplinary Research | 2024-10-02 | Article In Publication |
| 11 | FINDING EDGE METRIC SET OF A GRAPH USING A LOCAL SEARCH ALGORITHM | ZAHRA HAMED LABBAFIAN- MOSTAFA TAVAKOLI- NARJES SABEGHI | 55th Annual Iranian Mathematics Conference | 2024-08-14 | Article In Conference |
| 12 | USING LOCAL SEARCH ALGORITHM FOR DETECTABLE COLORING OF GRAPHS | MAEDEH SHAHABI- FREYDOON RAHBARNIA- MOSTAFA TAVAKOLI- NARJES SABEGHI | 55th Annual Iranian Mathematics Conference | 2024-08-14 | Article In Conference |
| 13 | Optimizing Natural Gas Liquids (NGL) Production Process: A Multi-Objective Approach for Energy-Efficient Operations Using Genetic Algorithm and Artificial Neural Networks | Narjes Sabeghi, Behroua Kiani Talaei, Reza Ghanbari, Khatere Ghorbani-Moghadam | Iranian Journal of Numerical Analysis and Optimization (IJNAO) | 2024-3-10 | Article In Publication |
| 14 | Optimized distance measures on hesitant fuzzy numbers: An application | Abazar Keikhka, Narjes Sabeghi | Journal of Intelligent & Fuzzy Systems | 2024-01-10 | Article In Publication |
| 15 | Showing the impact of processes improvements on the performance of Khorasan Regional Electricity Company (Mashhad, Iran) using the six sigma strategy | Narjes Sabeghi, Khatere Gorbani-Moghadam, Ladan Behroozi, Hamid Reza Yousefzadeh | 29th European Conference on Operational Research | July 2018 | Article In Conference |
| 16 | Generalized maximum covering location model in project control problem | Narjes Sabeghi, Hamed Reza Tareghian, Erik Demeulemeester | 11th International Conference on Computational Management Science | May 2014 | Article In Conference |
| 17 | Maximum covering location model in project control problem | Narjes Sabeghi, Hamed Reza Tareghian | 5th Iranian Conference on Applied Mathematics | September 2013 | Article In Conference |
| 18 | On the comparison of FLM and SA for determining the optimal timings of control points in a project | Narjes Sabeghi, Hamed Reza Tareghian, Erik Demeulemeester | 26th European Conference on Operational Research | July 2013 | Article In Conference |
| 19 | Optimal timing of project control points using facility location model and simulation | Narjes Sabeghi, Hamed Reza Tareghian | 25th European Conference on Operational Research | July 2012 | Article In Conference |
| 20 | Approximation of fuzzy functions using fuzzy linear programming | Narjes Sabeghi | 4th International Conference of Iranian Operations Research Society | May 2011 | Article In Conference |